News news center
Release time:: 2021-08-20 Click count: 1300
One or more dense busbars are installed vertically along the wall in the electrical well as the main power supply line.The busbar system generally consists of a starting busbar,a straight busbar(divided into two types with and without sockets),an L-shaped vertical(horizontal)bent busbar,and a Z-shaped vertical(horizontal)offset busbar.T-shaped vertical(horizontal)three-way busbar,X-shaped vertical(horizontal)four-way busbar,variable capacity busbar,expansion busbar,starting head,starting junction box,plug box,busbar related accessories and fastening devices.Zhenjiang Xinzhong Electrical Equipment Management Co.,Ltd.is capable of producing ambient air insertion bus ducts,dense insulation insertion bus ducts,and high-strength insertion bus ducts.
Compact bus duct conditions
Environmental temperature:Limit:Limit+40℃]C:-25℃
Altitude:below 2000m
Humidity:40 degrees Celsius,relative humidity less than 50%;At lower temperatures,the relative humidity may be high,
Exposure conditions for condensate water:
Earthquake.Basic strength:6 degrees of fortification.
Installation location:indoor and outdoor
Bus ducts for intensive production are widely used.It is now used in many companies,factories,buildings,hospitals,and other Chinese power systems.There are many characteristics to using dense bus ducts where needed.Its current capacity is very large.It is also beneficial for safety and technical performance research.Construction is very convenient.When using dense bus ducts,their current data capacity is very large,and their psychological endurance is generally very flexible.Both low and high currents can carry dense bus ducts.
The installation of busbar trunking adopts secondary reservation and secondary sealing technology:during the main construction stage,long holes are reserved at the places where busbars and cable trays need to be installed;Before installing the busbar and bridge,determine the actual position of the reserved long holes in the reserved long holes based on the actual layout and size of the busbar and bridge,and seal the original reserved long holes.